150-foot planning case
Inputs: 150 feet, local drilling and casing assumptions, standard pump/tank allowance, testing, permits and 15% contingency
Illustrative result: A complete-system estimate substantially above footage-only drilling cost
Use nearby official well records to choose a plausible depth range, then ask contractors what is included in the per-foot quote.