Missouri official-record workflow

Missouri Septic, Well & Flood Research for Rural Land

Combine WIMS well records with DHSS/local onsite-wastewater jurisdiction, FEMA/local flood information and parcel/title evidence before treating a rural Missouri parcel as buildable.

Decision path

Work from broad evidence to controlling evidence

  1. 01

    Determine onsite-wastewater jurisdiction

    Missouri has state minimum standards, but local ordinances or DNR jurisdiction can change who reviews a particular system.

  2. 02

    Search WIMS and licensed contractors

    Use public well records and contractor searches to build a realistic water-supply budget and identify recent local construction evidence.

  3. 03

    Screen karst and flood pathways

    Sinkholes, losing streams and floodplains can change both site design and wastewater/well protection needs.

  4. 04

    Confirm road and boundary evidence

    Use title, deed, plat and survey evidence for private access and boundaries; assessor/GIS is not enough for a closing decision.

  5. 05

    Price site systems separately

    Well, septic, driveway, culverts, electric and grading should each have visible assumptions and contingency.